Aggregate

Calling Lake Water Treatment Pond

Clear woodland and create 4 ponds lined with rubber membrane and a dump station for trucks. Construct a road 2 miles on lowlands.

Add card lock security access to site.

Road constructed to site.

Dumping stations for trucks flows into the two smaller ponds initially.

Athabasca High School

Prepare ground site for construction of High School
Create drain way and install drain system under road.